In week 9 final tweaks were carried out on the layout of the interface. The logo has been moved slightly upwards so that the bottom of the text lines up with the tag boxes on either side, and 2 of the corners on each tag box have been feathered. It was also suggested that the tag boxes should line up with the mirrors, but experimentation with this lead to the interface becoming to visually shallow. The final layout solution can be seen below -



Completion of the pear shape layers means that two of the heads are now complete to begin prototyping. In week 10, concept and development of the animation elements will be carried out, with basic testing beginning in flash. This is likely to include the animation of the logo, the transitions required for elements to appear in the scene, and the initial composition of the interface on startup.